Promoting an inclusive and sustainable landscape approach in managing the forest and watershed ecosystems servicing the Agus-Pulangi Hydropower Complex is the overall goal in ESSC’s recent collaboration with Forest Foundation Philippines (FFP).

Hydroelectricity provides a third of the power needs in Mindanao and it is essential that there is an in-depth understanding of the areas that supply water to major hydroelectric power plants in the region. The current state of these watershed areas in terms of forest cover losses, agricultural expansion, and population growth are also critical to know in developing the recommendations for action.

The need for updated and detailed land cover data of the areas that National Power Corporation (NPC) was managing was expressed during the presentation and turnover of the 2018 Bukidnon Land Cover Map in October 2020 at the Pulangi IV Hydro-Electric Power Plant in Maramag, Bukidnon.

For the first phase of the Agus-Pulangi Basins Profiling (APB) project, ESSC undertook an assessment of the land cover change in the Agus and Pulangi river basins to establish the biophysical basis for efficient and effective targeting of future forest management initiatives.

The ESSC report Land cover assessment of Agus-Lake Lanao and Upper Pulangi watersheds provides an analysis of land cover change in the two watersheds guided by the following research questions:

  • What are the top three dominant land cover classes in these watersheds?
  • Who are the watershed landscape stakeholders based on an analysis of the maps?
  • What areas constitute the headwaters of the river basins and which municipalities are responsible for these areas?
  • Which municipalities lost the most forests between 2005 and 2018 for Upper Pulangi Watershed and 2000-2020 for Agus-Lake Lanao Watershed?
  • How much forest was lost in contiguous forest areas in the two watersheds?

Also included in the report are 12 maps with accompanying tables characterizing the biophysical context of the two landscapes.

Forthcoming is the second phase of the profiling project that will assess and map the social vulnerability and hazard exposure to inform the forest and watershed management planning process within the Agus-Lake Lanao and Upper Pulangi watersheds.

Contributing to the effective management of forest ecosystems in the Agus and Pulangi watersheds: Assessing land cover change

Leave a Reply

Your email address will not be published. Required fields are marked *